Homepage | Set Home | Add to Favorites
Member

Shaanxi Kerlimar Engineers Co. Ltd


Products
  • No Category
Search
 

Friends links
  • No link

Acoustic detection tube flange
Click image to view full size image
Product: Views:72Acoustic detection tube flange 
Unit price: Negotiable
MOQ:
Quantity:
Delivery date: Since the payment date Days delivery
Valid until: Long-term effective
Last updated: 2017-12-19 12:35
  Inquiry
Details
Model Number: Acoustic detection tube flange Brand Name: Kerlimar Key Specifications/Special Features: Acoustic detection tube flange also is what we call the flange type ultrasonic detection tube, it USES the cast steel flange, screw fastening, convenient and reliable, without any equipment, special tools and technical personnel to install operation;Greatly shortened the time reinforcing cage erectness, convenient and quick.Flange type ultrasonic testing pipe installation procedures:1, insert the bottom pipe flange mount O ring in the tube, use screws to fix two pipe flanges, two tubes in the same axis, in the first quarter (at the bottom section) reinforcing cage.Then with the sound of the 12 or 14 will wire tube fixed in reinforcing cage, each separated by 1.5 meters around a fixed point acoustic detection tube can not ensure the up and down or so mobile is advisable.2, other reinforcement cage acoustic detection tube with reference to the first section of reinforcing cage in acoustic tube connection, but don't too tight and of reinforcing cage, loose to the up and down or so it is advisable to adjust the distance and Angle, acoustic detection tube for reinforcing cage when butt welding and other acoustic detecting tube reinforced cage.3, reinforcing cage after butt welding reinforcing cage and good acoustic detecting tube docking between the reinforcing cage, after the next note with wire in the process of reinforcing cage will not fixed sound tube is fixed in the reinforcement cage, after being reinforced LongXia pile, acoustic detection tube will cover note fresh water, rubber sealing cover can be pouring pile. Shipping Information: FOB Port: Tianjin
  • Lead Time: 10 - 45 days
  • Main Export Markets:
    • Asia
    • Mid East/Africa
    • Western Europe
    Inquiry